Our Blank CanvasGetting ready for set-out | Site WorksExcavation and site preparation ready for construction | Limestone Retaining WallApplying water proof sealer to rear of wall to stop moisture | Limestone Wall Under ConstructioPutting on top course of wall to access ramp |
---|---|---|---|
Wheel Chair Acess RampLeveling and tidy up on completion of block work | CompletionThe finishing touches with mulching and landscaping |
Oval Access Ramp Fairview Primary School Collie
Acoustic, Privacy Wall
Major Excavation
Excavation of clay soil for beer garden
During excavation
Having the right machine for the job
Base Of Wall
Getting the base right is one of the most important aspects of the job
10 course Wall under construction
Completing the retaining wall from top as 10 course wall is approximately 3.5mtr high
5ton Excavator
Our IHI excavator used for all our block laying there is no job to big or to small
Trees in for Landscaping
Getting the trees in early as there will be no access after wall goes in
Reconstituted Limestone Blocks
Stock piling more blocks ready for the next wall
Looking Good
Nearing the finishing stages, have planted trees, piers to top of wall ready for fencing and ground ready for paving
The Finished Product
All ready for paving, Beer garden at Crown Hotel Collie
Stone Pitching
Earth Blocks